Showing posts with label impower. Show all posts
Showing posts with label impower. Show all posts

19 April 2013

Committee Room 1 - Den of Incompetence

Guess which box Mr Mustard thinks the council are in (no prize)
Mr Mustard does to lots of council meetings. He reads lots of rubbish reports which should not have reached the committee. The committee pass them anyway even if they are utter tosh. Mr Mustard decided to do something about it. Here is what he wrote to the leader of the council and copied to very councillor so that they can be in no doubt of the standard he expects to see.

To make sense of it you need to see all the questions and answers from the meeting


and now what Mr Mustard wrote:



Committee Room 1 - the Den of Incompetence

I expect you will recall Richard, from Constitution Committee of 10 April, that I commented for 5 minutes upon the disappointing way in which the previous meeting had been handled.

I also asked 29 questions as there were that many points which required clarification in just 2 sections of the constitution, the ones relating to procurement.

The conclusions I have drawn from attending many meetings are:

1          Chairmen are in too much of a rush.
2          Some councillors make no input whatsoever
3          Not all councillors read all of the papers in advance
4          Reports are strewn with errors

My comment concluded with me asking to see more and longer scrutiny meetings and self evident proof that every councillor has thoroughly read the papers. The way in which I expected that to be demonstrated was by councillors coming to committee meetings armed with questions which they want answering and with the Chairman having gone through the report before it is published so that all glaring errors and inconsistencies are removed. There should be little left for the public to ask about if reports are clear, concise and accurately written in plain English.

Now roll forward to Cabinet Resources of 18 April 2013 and the situation was still dire.

I looked in detail only at the CCTV item. The report had been prepared by James Mass, an iMpower consultant who has been seconded to the council and for whom we are doubtless invoiced a pretty penny.

I asked 9 questions and some need further discussion.

Q1       The answer revealed that the numbering of the appendices was incorrect. Seemingly no councillor attending had noticed this nor had any officer or if they had they couldn't be bothered to do anything about it. Could the reason possibly be that they don't read very carefully, if at all?

Q2       This answer is not exactly clear, accurate or helpful. The document which has now been produced refers to an Options Appraisal undertaken in November 2011 and is the very document I asked to see and should now be sent to me please. The point of my question was to look at the thought process and methodology at the earliest stage so I could see how we had got to where we were. What the document produced shows me is that in procurement the council allows the tail to wag the dog. The final question in the soft market testing report asks the supplier what contract length they would find ideal. What the council should be doing is deciding what length contract the council would find ideal, probably the lifetime of the equipment, and telling the contractor that is the contract period they can bid for. We are nowhere near out of the woods with procurement disasters if this is the typical way of going on.

Q3       The answer should simply have been "No". In answer to my supplementary question, Cllr Thomas had to admit that a one third reduction in staffing was a possibility.

Q4       Councillors should have had this information made available to them in the main report if they want to make considered decisions about options. Now take a good look at the answer given in writing. I only had 2 minutes before the meeting to study these and prepare my supplementary questions. A pity as the answer I have been given is wrong. You only have to glance across the rows and then look at the total for the in-house option to see that it is wrong. It jumped off the page at me today.

No councillor thought to ask why the contingency for the in-house option was £346,385 and £zero for outsourcing. Doesn't a contingency of £346,385 when spending a capital sum of about £947,000 (there is not a clear table of capital costs) strike you as a bit over the top? It is 36% and seriously skews the options in favour of full outsourcing; anyone would think that the report had been deliberately slanted that way with in-house costs over-stated to make the in-house option look unattractive.

You will recall that Mr Mass said that the extra £20,000 on consultancy was to pay an additional expert in specifying the CCTV and setting it up. Surely if we are paying an expert £20,000 we won't need a contingency of £346,385? Once that is taken out of the equation and Table 4 is updated with the correct figure for implementation costs it starts to look rather different, viz:

£
Out-source
Half way
In-House
Transition costs
215,250
215,250
322,875
Contingency
0
0
0
Income
(350,661)
(304,060)
(304,060)
Expenditure
6,577,821
6,881,390
6,552,547
TOTAL
6,442,410
6,792,580
6,571,362
CURRENT COSTS
7,255,920
7,255,920
7,255,920
Implementation costs
247,000
220,000
214,000
NET (BENEFIT) / COST
(566,510)
(243,340)
(470,558)

A 1.5% saving (the difference between projected outsourcing and in-house costs is only £96,000) does not seem enough compensation for the loss of direct control, data security risk and loss of flexibility which goes hand-in-hand with outsourcing.

The answer given by James Mass to my supplementary question was that there were an extra £20,000 of consultancy costs for the in-house option. Now go to page 56 of the report pack (page 18 of the CCTV section) and read this "Option 3: 250,000 additional consultancy costs to support specification of system". No councillor spotted this £230,000 sized error and nor did any officer who touched the report before it was issued. Sloppy work all round I would say.

Mr Mass is on secondment. Can we send him back to iMpower because we don't seem to be getting value for money?

I consulted Mr Dix about this report. This is what he had to say:

I don’t get the reason for the additional £107k transition costs for the in-house team - it is counter intuitive and not supported by any clear evidence. The contingency issue is fundamentally flawed because, subject to the judicial review, Capita will be responsible for procurement and, if anything, they claim to offer the best possible procurement opportunity because of their centralised resources. As such there is absolutely no rational for the contingency. They have also included £250k in option 3 expenditure for system specification yet in the document they have specified exactly what they want. Perhaps a small budget to fine tune the details but £250k seems completely out of proportion. That is the balancing figure with the contingency and transition costs that makes the in house option the least attractive instead of the most attractive. Without a doubt this is the most biased and unsound analysis I have seen and, based on the incorrect figures given at the CRC in reply to questions, incompetent, on the basis that they can't add up. Richard Cornelius should be utterly embarrassed that officers put out this flimsy business case in the name of efficiency and best value.

Q9.      Given that I showed that it might be possible to perform the service Sussex style for about half the cost in-house I think that what councillors should have done at CRC was to have asked for the Outline Business Case to be updated with more accurate figures and have it brought back to the meeting. Is it any wonder that the council ends up in so many judicial reviews when it is so cavalier with the money of residents?

Summary

Now how can councillors be giving due regard to their duties and value for money when they are galloped though an agenda of 171 pages in 44 minutes flat. I wrote down the time from my mobile phone that items 5, 6 & 7 were agreed at. They were all at 20:12

Item 8 at 20:14

Item 9 at 20:17 and so on.

You need to slow that Cllr Thomas down and every councillor needs to start asking questions. The subject matter is more important than an early dinner.

I will tell you this to your face Richard but officers and consultants are incompetent, reports are riddled with errors and councillors aren't doing the job that they get well rewarded for. You all need to pull your socks up to the point where no member of the public, in their spare time, can make you look to be such a blisteringly incompetent shower. I do hope that the next report I study is 100% accurate.

Have a nice weekend.

Best regards

Mr Mustard

3 August 2012

£7m in and on Amber alert (with red blotches)

Mr Mustard realised it was quite a while since he reported generally on One Barnet but then no-one inside the council seems to have reported on it since 24 April (to Budget & Performance Overview & Scrutiny - papers here ; for now you will have to download the whole thing as the Appendix 1 link seems to be broken).

The pdf is sadly sideways as Mr Mustard doesn't lash out hundreds of pounds on software. If some kind soul wants to use their version of Adobe Acrobat to turn this round for Mr Mustard it would be greatly appreciated (please email the corrected version to mrmustard@zoho.com) . If you download it from scribd you can view it sideways on the screen, just not save it, and it will print correctly.
One Barnet Programme Report 24 April 12
If you want to see it the easier way around, here we go, with a series of jpg images that you can click on to increase in size:
















Some points extracted from the above:

How is the legal services merger going? It is too early to say until all this One Barnet nonsense is out of the way although we have seen Harrow staff not know that planning decisions cannot be taken after a certain time and try to give advice after a vote has been taken (too late!).

The HR update is a masterpiece of delusion. Mr Mustard doubts that a single person is looking forward to working for BT, Crapita or EC Harris.

This report shows how worthless the traffic light system is. For parking two of the indicators were amber and so overall the project was green which is an over-generous way of marking. All the accounts, and secret documents, that have reached the eyes & ears of Mr Mustard show that the new contract is a shambles and this is in the public domain given how badly appeals have been going for the council at PATAS.

The delay of the IPT upgrade is a significant issue ...data within detailed business cases will be less robust (i.e. wrong )  but One Barnet ploughs on regardless.

Route sharing with Brent didn't last very long due to customer complaint. Mr Mustard expects that the customer was put last in the process and was driven all round Brent & Barnet before reaching their destination like a holidaymaker on a cheap trip in a coach on the Costa del Sol.

The transport bureau hasn't been very well planned; "issues with staff transfer" and "the lack of IT system in the WLA Transport Bureau" yes, in 2012!

Oh dear me Robert Rams, the worst performing project is Libraries and your project is going to take over 3 years to complete. "Programme is still developing a fully worked and approved plan..."

The major risks are so worrying that the public cannot be allowed to see them (p33). Mr Mustard thinks we should be told so has the matter with the Information Commissioner.

Major issues. Oh dear Robert, there is  no budget for library transformation. That may be a blessing as it will stop change occurring.

Just look at the spending on this vanity project. By April 2013 the allocated spend will be £9,172,748 and that is without valuing the time of management and staff taken off their normal daily jobs.

£9m spent and nothing really to show for it.

Stop the world, let Mr Mustard off.

Yours frugally

Mr Mustard








23 December 2011

A target for Impower

When Mr Mustard saw that a survey was being carried out by Barnet Council to try and improve recycling rates he asked a few questions. Here they are along with the answers:

I am writing in respect of your enquiry for information held by the Authority under the provisions of the Environmental Information Regulations.
 
Please find the information you requested enclosed. If you have any queries concerning the information please contact me at the supplied address.

1       What experience does Impower have in recycling as a search for the word "recycling" on their website brings up no responses?

This is a joint project between Barnet Council and Impower. Impower do not have specific experience in recycling
Mr Mustard thinks that the next answer, which was in response to a question that he didn't ask, actually provides the answer to the problem.
Their experience is primarily with delivering improvements and efficiencies in local government. They have experience of a wide range of projects that relate to understanding the motivations of service users. Let us assume that May Gurney actually collect everything that is put out by residents. Therefore the biggest improvement in recycling rates is to be found from making sure that all residents recycle every possible item.

For this project the knowledge of recycling is provided by Barnet Council officers.
So all that Impower had to do was to make 600 phone calls, presumably using a database from Barnet Council, run through some questions with the 120 residents who had the time or inclination, and then set up a meeting or two. A doddle, and never worth the price paid for such a simple mechanistic job. So Barnet Council officers are providing the knowledge and yet, as noted further down, Impower are leading the project. Sounds like the tail is wagging the dog.

2       What is the cost for the survey to be carried out?
£16,750.
Barnet Council officers on inflated salaries really don't think about what things should cost or how reasonable they are in relation to the workload. 

3       How was Impower chosen for this work?
As part of the One Barnet Programme the Council has commissioned a number of delivery partner organisations and this includes Impower. This project is being led by Impower under these arrangements.
So they were a shoo-in.

4       How many people will be spoken to on the telephone and how many will be met face-to-face?
Over 600 residents were contacted by telephone. Of these 120 completed a telephone survey, and 31 attended face to face discussion group meetings. Mr Mustard wonders if the type of people who can be bothered to complete telephone surveys are the same ones as can be bothered to do their recycling properly? This exercise should be carried out by a council officer walking the streets with the lorry and knocking on the doors of the properties which don't recycle and finding out why and offering some sort of carrot to get started.

There is a bit more to this story yet. On 6 December there was a meeting of the Budget & Performance Overview & Scrutiny committee. Here is the item presented about recycling and waste

Budget & Performance Overview & Scrutiny 6 December 2011 Recycling

Don't worry about the £50 fines that they are so keen on in Harrow if you put the wrong thing in the bin as Barnet are not going to do this ( perhaps they are learning that the stick does not work ) which is fair as you cannot stop anyone who passes your bin in the front garden from putting what they like in it as they pass down the street.

There is a chart on page 42 that Impower doubtless created which one of the councillors wanted to know more about and he wanted a simple explanation. Good on you councillor as charts of this type are pointlessly complicated. You asked how much this report cost. The Assistant Director in EPR might have mumbled the answer, or the room could just have been too noisy as there were 2 or 3 £millions worth of officers in the room, as Mr Mustard heard £5,000 but upon checking the figure he was staggered to find that it was £65,000

Now according to the press release about recycling with Cllrs Old & Rutter in the picture, Barnet residents have generated £1m of recycling in one year ( and May Gurney pocket the same amount for no good reason that Mr Mustard can think of ) so a 1% increase in recycling would generate £30,300 of extra income from the sale of recyclates. Assuming that the same amount of rubbish is kept out of landfill there will be a commensurate saving in landfill tax.

The story is a little more complicated than that though as Barnet council just love making the population bigger every year which they encourage mainly by building, or allowing the building of, more and more properties without, in Mr Mustard's opinion, sufficient regard to the manifold consequences.

The population projections used by the council show Barnet's population rising from 334,600 in 2008 to to 371,150 by 2018 - a rise of over ten per cent.

So a 10% increase in population means that recycling tonnage should go up by 1% every year without even trying.

The amount Barnet Council receives is £33.11 a tonne from recycling ( so it is actually worth £66.22 per tonne). If £1,000,000 is received by Barnet Council, then the total income is £2,000,000 which at £66.22 per tonne means that about 30,200 tonnes were recycled. This is very odd as the report shows 13,000 to 15,000 tonnes being collected per quarter so that should be 52,000+ tonnes per annum and much more income for the tax payers of Barnet to help keep their council tax down. Mr Mustard will take this apparent discrepancy up with the Assistant Director.

The saving from sending another 1% to recycling instead of landfill is 600 tonnes ( £1,000,000 / 33.11 ) at current landfill levy of £56 a tonne = a cost saving of £33,600

Mr Mustard thinks that a 1% increase in recycling rate, from 33% to 34%, would generate an income of £30,300 ( £1,000,000 /33 * 34 ). Add this to the cost saving and 1% = £63,900 which is, by chance, very close to the cost of Impower.

So we need to see at least a 2% improvement in the annual tonnage performance as 1% is just population inflation and 1% is equivalent to the cost of Impower.

It will be at least a year before we know if Impower have been of any use.

Yours frugally

Mr Mustard

13 December 2011

The Agilisys contract - over £500,000

Here is the DPR which set Barnet Council down the path of using Agilisys and Impower (directors now include Max Wide) as the One Barnet overlords - Mr Mustard can't actually work out who is in charge of One Barnet - anyone want to tell him if it is the leader (the small L is deliberate), non-stick Nick Walkley the Chief Executive - too pre-occupied with the car park surely to have time for One Barnet? - or the consultants who stand to make a bundle (collective noun for a set of services to be outsourced?) 

DPR 1134 One Barnet Implementation

and the cost of this contract?

5.3 The cost of the Implementation Partner contract is assessed to be in excess of £500,000

This DPR has the name of Councillor Thomas on it as well as being the product of Craig Cooper. What do you suppose "in excess of £500,000 means?" £600k, £700k but certainly less than a million?

Here is what has been bunged at Agilisys and Impower ( all Impower payments go to Agilisys ) from 5 August 2010 to 31 October 2011 i.e. in 15 months.


Service Area Type Date Ref. £
Commercial Directorate Consult Fees 05/04/2011 5000300520 8,244.50
Children's Service Consult Fees 05/04/2011 5000300525 3,980.00
Commercial Directorate Consult Fees 05/04/2011 5000300530 10,800.00
Commercial Directorate Consult Fees 05/04/2011 5000300531 43,152.00
Commercial Directorate Consult Fees 05/04/2011 5000300536 14,550.00
Commercial Directorate Consult Fees 05/04/2011 5000300539 33,050.00
Commercial Directorate Consult Fees 05/04/2011 5000300541 34,057.00
Commercial Directorate Consult Fees 05/04/2011 5000300544 17,891.00
Commercial Directorate Consult Fees 05/04/2011 5000300545 5,149.50
Commercial Directorate Consult Fees 05/04/2011 5000300546 7,350.00
Commercial Directorate Consult Fees 05/04/2011 5000300549 10,450.00
Commercial Directorate Consult Fees 05/04/2011 5000300550 6,750.00
Commercial Directorate One Barnet 20/05/2011 5000304891 837.00
Commercial Directorate One Barnet 20/05/2011 5000304890 1,144.50
Commercial Directorate One Barnet 20/05/2011 5000304893 1,225.00
Commercial Directorate One Barnet 20/05/2011 5000304902 1,350.00
Commercial Directorate One Barnet 20/05/2011 5000304892 5,282.00
Commercial Directorate One Barnet 20/05/2011 5000304908 7,250.00
Commercial Directorate One Barnet 20/05/2011 5000304900 10,599.00
Commercial Directorate One Barnet 20/05/2011 5000304909 11,836.50
Commercial Directorate One Barnet 20/05/2011 5000304894 21,303.00
Commercial Directorate Consult Fees 30/06/2011 5000309458 35,114.00
Commercial Directorate Consult Fees 28/06/2011 5000309170 22,918.50
Commercial Directorate Consult Fees 28/06/2011 5000309171 5,500.00
Commercial Directorate Consult Fees 28/06/2011 5000309166 3,537.00
Commercial Directorate Consult Fees 28/06/2011 5000309167 2,362.00
Commercial Directorate Consult Fees 04/07/2011 5000309635 18,078.00
Commercial Directorate Consult Fees 04/07/2011 5000309636 14,193.00
Commercial Directorate Consult Fees 28/07/2011 5000312468 5,400.00
Commercial Directorate Consult Fees 04/07/2011 5000309638 4,151.50
Commercial Directorate Consult Fees 11/08/2011 5000314087 29,812.50
Commercial Directorate Consult Fees 11/08/2011 5000314088 25,970.50
Commercial Directorate Consult Fees 10/08/2011 5000314003 23,537.00
Commercial Directorate Consult Fees 11/08/2011 5000314068 19,080.50
Commercial Directorate Consult Fees 11/08/2011 5000314094 10,326.50
Commercial Directorate Consult Fees 10/08/2011 5000314006 4,380.50
Commercial Directorate Consult Fees 11/08/2011 5000314090 3,249.00
Commercial Directorate Consult Fees 11/08/2011 5000314097 712.50
Commercial Directorate Consult Fees 16/09/2011 5000317667 8,579.00
Commercial Directorate Consult Fees 16/09/2011 5000317668 20,762.00
Commercial Directorate Consult Fees 16/09/2011 5000317669 27,821.00
Commercial Directorate Consult Fees 16/09/2011 5000317670 3,298.00
Commercial Directorate Consult Fees 23/09/2011 5000318408 17,632.00
Corporate Governance Consult Fees 19/09/2011 5000317785 6,200.00
Commercial Directorate Consult Fees 31/10/2011 5000322323 47,543.50
Commercial Directorate Consult Fees 17/10/2011 5000320850 28,500.00
Commercial Directorate Consult Fees 21/10/2011 5000321596 26,750.00
Commercial Directorate Consult Fees 13/10/2011 5000320638 24,957.00
Commercial Directorate Consult Fees 31/10/2011 5000322315 19,413.00
Commercial Directorate Consult Fees 18/10/2011 5000321041 14,137.20
Commercial Directorate Consult Fees 11/10/2011 5000320433 13,661.00
Commercial Directorate Consult Fees 18/10/2011 5000321038 12,347.50
Commercial Directorate Consult Fees 31/10/2011 5000322316 11,998.50
Commercial Directorate Consult Fees 17/10/2011 5000320854 9,727.00
Commercial Directorate Consult Fees 11/10/2011 5000320436 2,375.00
Commercial Directorate Consult Fees 31/10/2011 5000322318 1,700.00
Commercial Directorate Consult Fees 13/10/2011 5000320636 962.50
Planning, Housing & Regeneration Consult Fees 14/09/2010 5000272478 57,068
Commercial Directorate Consult Fees 01/02/2011 5000289778 15,384
Commercial Directorate Consult Fees 01/02/2011 5000289778 15,384
Commercial Directorate Consult Fees 01/02/2011 5000289779 23,548
Commercial Directorate Consult Fees 01/02/2011 5000289783 6,147
Commercial Directorate Consult Fees 01/02/2011 5000289786 4,025
Commercial Directorate Consult Fees 01/02/2011 5000289788 2,240
Commercial Directorate Consult Fees 01/02/2011 5000289788 2,240
Commercial Directorate Consult Fees 01/03/2011 5000294012 -6,500
Commercial Directorate Consult Fees 01/03/2011 5000294013 -102,860
Commercial Directorate Consult Fees 01/03/2011 5000294231 19,900
Commercial Directorate Consult Fees 01/03/2011 5000294232 6,500
Commercial Directorate Consult Fees 01/03/2011 5000294236 102,860
Commercial Directorate Consult Fees 01/03/2011 5000294238 93,250
Commercial Directorate Consult Fees 01/03/2011 5000294240 15,050
Commercial Directorate Consult Fees 01/03/2011 5000294245 11,940
Commercial Directorate Consult Fees 01/03/2011 5000294246 11,975
Commercial Directorate Consult Fees 01/03/2011 5000294248 14,940
Commercial Directorate Consult Fees 01/03/2011 5000294272 30,425
Commercial Directorate Consult Fees 01/03/2011 5000294275 187,150
Commercial Directorate Consult Fees 01/03/2011 5000294276 27,600
Commercial Directorate Consult Fees 01/03/2011 5000294279 53,125
Commercial Directorate Consult Fees 01/03/2011 5000294301 91,050
Commercial Directorate Consult Fees 02/03/2011 5000294465 -93,250
Commercial Directorate Consult Fees 02/03/2011 5000294467 -15,050
Commercial Directorate Consult Fees 02/03/2011 5000294468 -30,425
Commercial Directorate Consult Fees 02/03/2011 5000294469 -187,150
Commercial Directorate Consult Fees 02/03/2011 5000294471 -27,600
Commercial Directorate Consult Fees 02/03/2011 5000294472 -53,125
Commercial Directorate Consult Fees 02/03/2011 5000294473 -91,050
Commercial Directorate Consult Fees 02/03/2011 5000294474 -19,900
Commercial Directorate Consult Fees 02/03/2011 5000294475 -11,940
Commercial Directorate Consult Fees 02/03/2011 5000294476 -11,975
Commercial Directorate Consult Fees 02/03/2011 5000294479 -14,940
Commercial Directorate Consult Fees 02/03/2011 5000294495 5,775
Commercial Directorate Consult Fees 02/03/2011 5000294498 700
Commercial Directorate Consult Fees 02/03/2011 5000294517 15,395
Commercial Directorate Consult Fees 02/03/2011 5000294520 1,700
Commercial Directorate Consult Fees 02/03/2011 5000294521 10,602
Commercial Directorate Consult Fees 02/03/2011 5000294528 14,581
Commercial Directorate Consult Fees 02/03/2011 5000294529 2,375
Commercial Directorate Consult Fees 02/03/2011 5000294531 32,970
Commercial Directorate Consult Fees 02/03/2011 5000294534 4,280
Commercial Directorate Consult Fees 02/03/2011 5000294538 11,975
Commercial Directorate Consult Fees 02/03/2011 5000294539 11,940
Commercial Directorate Consult Fees 02/03/2011 5000294541 18,008
Commercial Directorate Consult Fees 02/03/2011 5000294542 11,979
Commercial Directorate Consult Fees 02/03/2011 5000294569 12,882
Commercial Directorate Consult Fees 02/03/2011 5000294571 14,364
Commercial Directorate Consult Fees 02/03/2011 5000294577 10,314
Commercial Directorate Consult Fees 02/03/2011 5000294580 6,475
Commercial Directorate Consult Fees 02/03/2011 5000294584 8,425
Commercial Directorate Consult Fees 02/03/2011 5000294594 13,890
Commercial Directorate Consult Fees 02/03/2011 5000294609 4,480
Commercial Directorate Consult Fees 03/03/2011 5000294758 2,187
Commercial Directorate Consult Fees 18/03/2011 5000297080 32,970
Commercial Directorate Consult Fees 18/03/2011 5000297080 10,602
Commercial Directorate Consult Fees 18/03/2011 5000297083 2,187
Commercial Directorate Consult Fees 22/03/2011 5000297453 -2,187
Commercial Directorate Consult Fees 28/03/2011 5000298863 -10,602
Commercial Directorate Consult Fees 28/03/2011 5000298863 -32,970
Commercial Directorate Consult Fees 02/12/2010 5000282907 19,900
Commercial Directorate Consult Fees 02/12/2010 5000282909 10,292
Commercial Directorate Consult Fees 02/12/2010 5000282910 77,175
Commercial Directorate Consult Fees 02/12/2010 5000282913 24,523
Commercial Directorate Consult Fees 02/12/2010 5000282914 43,450
Commercial Directorate Consult Fees 02/12/2010 5000282919 16,448
Commercial Directorate Consult Fees 23/12/2010 5000285770 32,146
Commercial Directorate Consult Fees 23/12/2010 5000285771 30,109
Commercial Directorate Consult Fees 23/12/2010 5000285774 21,916
Commercial Directorate Consult Fees 23/12/2010 5000285778 24,760

Total

1,424,988.84

So only 15 months in, still another 21 to suffer, and the pig nuts are rattling into the trough at the rate of £95,000 worth a month. The cost has blasted past a mere £500,000

Given that Craig Cooper the £132,480 a year Director of non-Commercial Services also wrote this:

3.3 Procurement and contracting skills: Poor procurement and contracting skills as well as leadership capacity constraints in the Council could limit the ability to obtain the desired efficiencies and service improvements. Key future shape activities would include focused work to develop the Council’s contracting and procurement expertise as well as the development and implementation of a public sector leadership development programme directly to address and mitigate these risks.

The bloggers have been banging on about poor procurement skills all year. MetPro for one back in March, some 8 months after poor procurement was identified as a problem by you and a key future shape activity. So then 12+ months and over 2 million quid later along comes RM Countryside who have been engaged in questionable circumstances during the last 6 years. So much for Cllr Thomas holding you to account Captain Cooper.

Mr Mustard thinks that Cllr Thomas works for a building society. If you were self building a house and told him you needed to borrow £500,000 and then got half built and had already spent £1.4m do you suppose he would find it acceptable? Perfectly acceptable for this sort of spend though inside Barnet Council.

How long will it be before procurement is properly managed?

See you in 2012 for yet another tale of woe about procurement.

Yours frugally

Mr Mustard